Integrate ASAS-AI in Workflows

How to Use ASAS-AI in Your Engineering Workflow

How to Integrate ASAS-AI into Your Engineering Workflow

A practical walkthrough for civil and structural engineers in Qatar โ€” covering how to set up ASAS-AI, use Smart Commands effectively, generate compliant documents, and embed the platform into real project tasks.

1. What ASAS-AI is โ€” and what it is not

ASAS-AI is an AI assistant built specifically for engineers working in Qatar and the GCC. It runs on Claude, one of the leading large language models, and is layered with a detailed engineering knowledge base covering Qatar’s local codes, standard specifications, and project documentation formats.

Understanding its purpose helps you use it more effectively. ASAS-AI is a workflow tool, not a design software. It does not replace your structural analysis programs, BIM models, or QS software. What it does is handle the knowledge-intensive, writing-intensive, and document-intensive parts of engineering work โ€” the tasks that consume time but rarely require a calculator.

๐Ÿ’ก
Best mental model

Think of ASAS-AI as a technically fluent colleague who knows Qatar’s codes well, writes quickly, and is always available โ€” not as an autonomous engineer. You direct the work; it executes and drafts.

What ASAS-AI handles well:

  • โœ“ Drafting FIDIC contract notices, letters, and formal correspondence
  • โœ“ Generating QCS-referenced specifications and submittals
  • โœ“ Preparing GSAS/LEED documentation and compliance checklists
  • โœ“ Explaining code clauses, design standards, and regulatory requirements
  • โœ“ Creating and formatting engineering reports, RFIs, and technical memos
  • โœ“ Producing DXF sketches, charts, and diagram visuals from a text description
  • โœ“ UPDA exam study notes, code summaries, and worked explanations
โš ๏ธ
Know the limits

Always review AI-generated engineering content before submission. ASAS-AI can make errors on specific numeric calculations or code references. Use it as a first draft and apply your professional judgment โ€” as you would with any junior colleague’s work.

2. Getting started: your first session

Access ASAS-AI at ai.asddconcept.com. Register with your email address โ€” the Free plan activates immediately with 100,000 tokens per month and no credit card required.

01

Register and log in

Create your account at ai.asddconcept.com. Your membership tier, token balance, and reset date are visible in your profile dashboard.

02

Open a new conversation

Conversations are stateful โ€” the assistant remembers what you have said earlier in the same session. Start each new project task in a fresh conversation to keep context clean.

03

Provide project context upfront

Before asking a question, briefly state your project type, location, applicable code, and your role. The more context you give, the more targeted and accurate the output will be.

04

Use Smart Commands or free-form chat

For structured document tasks, use the Smart Commands library. For open-ended questions, code interpretation, or brainstorming, use the chat interface directly.

05

Review, refine, and export

Iterate on the output within the conversation โ€” ask for edits, additions, or a different tone. When satisfied, export to your required format: Word, PDF, Excel, PowerPoint, or DXF.

๐Ÿ’ก
Providing context โ€” example

Instead of: “Write a FIDIC notice.” โ€” try: “I am the contractor’s engineer on a road widening project under an Ashghal contract using FIDIC Red Book 1999. The employer’s representative has issued a variation instruction that extends our scope without adjusting the contract price. Draft a Clause 20.1 notice preserving our right to claim additional cost and time.”

3. Using Smart Commands in your workflow

Smart Commands are pre-built engineering workflows. Instead of writing a complex prompt from scratch, you select the relevant command, provide a few parameters, and receive a structured output. They are designed around real documentation tasks engineers perform regularly on Qatar projects.

There are currently 75+ commands across 14 categories:

FIDIC Contracts
Notices, claims, correspondence
QCS Specifications
Submittals, method statements
GSAS / Sustainability
Compliance docs, checklists
Structural Engineering
Design checks, summaries
Geotechnical
Foundation reports, soil notes
MEP / KAHRAMAA
Compliance checklists
Project Correspondence
RFIs, letters, memos
UPDA Preparation
Study notes, code summaries
Risk Management
Risk registers, assessments
Tender Documents
Bills of quantities guidance
Document Factory
Reports, templates
Visual Engine
Charts, DXF, diagrams

Example: FIDIC Clause 20.1 โ€” Notice of Claim

Smart Command โ†’ FIDIC Notices FIDIC Red Book
“Contractor received a variation order for additional piling works. Instruction issued 18 days ago. Contract is FIDIC 1999 Red Book. Client: Ashghal. Generate a Clause 20.1 notice preserving cost and time claims.”
Output includes
  • Properly structured formal notice with contract reference and clause citation
  • Notice date, event description, and claim basis under Sub-Clause 20.1
  • Statement of intent to submit a fully detailed claim
  • Correct signatory block and distribution list format
  • Ready to export as Word or PDF

Example: GSAS compliance checklist

Smart Command โ†’ GSAS / Sustainability GSAS 2019
“Mixed-use residential tower, Doha. G+20 floors. Design team seeking GSAS 3-star rating. Generate a preliminary compliance checklist for the Energy and Indoor Environment categories.”
Output includes
  • Structured checklist mapped to GSAS 2019 credit categories
  • Minimum point thresholds per category for 3-star target
  • Applicable measures for the building type and climate zone
  • Notes on documentation required at each GSAS submission stage
โ–ถ
How to use commands effectively

Commands produce the best results when you include: the project type, applicable code edition, the specific task, and any important constraints (deadlines, parties involved, contract clause numbers). Think of it as briefing a colleague, not searching a database.

4. Generating and exporting documents

Every conversation in ASAS-AI can be converted into a downloadable file. The document engine runs server-side โ€” meaning the formatting and file generation happen on the platform, not in your browser, which produces cleaner and more reliably structured output.

.docx

Word Document

Formatted report, letter, notice, or submittal ready for review and signature.

Best for: FIDIC correspondence, technical reports, method statements
.pdf

PDF

Styled, paginated output suitable for formal submission or client distribution.

Best for: Formal submissions, consultant letters, regulatory documents
.xlsx

Excel Spreadsheet

Structured data tables, calculation summaries, and inspection record formats.

Best for: Inspection checklists, risk registers, quantity schedules
.pptx

PowerPoint

Slide decks for design presentations, project updates, or technical briefings.

Best for: Client presentations, design review meetings, progress reports
.dxf

DXF / AutoCAD

AutoCAD-compatible drawing file generated from a text description of a layout or diagram.

Best for: Schematic layouts, grids, reference diagrams for CAD insertion
.svg

Charts & Diagrams

ECharts data visualisations and Mermaid flowcharts rendered as vector graphics.

Best for: Project dashboards, process diagrams, schedule overviews

Export workflow

01

Generate the content in chat

Use a Smart Command or a free-form prompt to produce the document content. Iterate until the structure and information are correct.

02

Select the export format

Tell ASAS-AI which format you need: “Export this as a Word document” or “Generate a PDF version of this letter.”

03

Download and finalise

The file is generated and made available for immediate download. Open in your preferred application, add your signature block or company letterhead, and submit.

5. Working with Qatar regulatory standards

ASAS-AI is trained on the specific codes, standards, and procedures that govern engineering projects in Qatar. The following table summarises the main regulatory frameworks the platform covers and typical tasks where it is most useful.

Standard / Body Coverage Typical use in ASAS-AI
QCS 2014 Qatar Construction Specification โ€” full code Specification writing, clause interpretation, submittal checklists
GSAS / QSAS Qatar sustainability rating system Credit checklists, documentation summaries, compliance notes
Ashghal Road design, infrastructure, drainage standards Design requirement summaries, submission format guidance
KAHRAMAA Electrical, water, and MEP regulations MEP compliance checklists, regulation interpretation
UPDA Engineer registration and exam framework Exam preparation notes, code summaries, worked examples
FIDIC (Red/Yellow/Silver) International construction contracts Notices, claims, EOT letters, correspondence under specific clauses
Eurocode / BS European structural and civil standards Code clause lookups, design requirement explanations
ACI / AISC / AASHTO American concrete, steel, highway standards Design provision summaries, comparison with local code requirements
๐Ÿ’ก
Always cite the edition

When asking about a specific code, state the edition (e.g., “QCS 2014”, “FIDIC Red Book 1999”, “GSAS 2019”). Code editions differ โ€” specifying the correct one ensures the response references the right clause numbers and requirements.

6. Real workflow scenarios

Below are four common engineering situations and how a practitioner would use ASAS-AI to handle them efficiently.

๐Ÿ“‹

Scenario A โ€” Contractor’s engineer, variation claim

FIDIC Red Book 1999 ยท Ashghal project ยท Structural works
Open a new conversation. State the project type, client, and contract form.
Use the FIDIC Notices command. Input: variation instruction reference, date issued, nature of the additional work.
ASAS-AI drafts a Clause 20.1 notice with the correct legal phrasing and timeline references.
Request a follow-up: “Also draft a covering letter to the Engineer summarising the variation scope and requesting confirmation of the instruction in writing.”
Export both documents as Word files. Add your letterhead and submit.
๐Ÿ—๏ธ

Scenario B โ€” Consultant preparing a GSAS submission

GSAS 2019 ยท Mixed-use tower ยท Design stage
Brief ASAS-AI on the project: building type, height, location in Doha, GSAS target rating.
Use the GSAS Compliance command to generate a preliminary checklist for the Energy and Indoor Environment categories.
Ask follow-up questions: “Which credits are most achievable for a residential tower in Qatar’s climate?” and “What documentation does the assessor require at Stage 1?”
Export the checklist as Excel for the design team to track credit compliance during detailed design.
๐Ÿ“

Scenario C โ€” Structural engineer, design basis memo

Eurocode ยท RC frame building ยท Submittal to Ashghal
Describe the structure: RC frame, G+5, seismic zone, site classification, Doha location.
Ask ASAS-AI to draft a Structural Design Basis report outline covering: codes used, load assumptions, material specifications, analysis methodology, and software employed.
Expand each section within the same conversation: “Write the Materials section referencing QCS 2014 concrete mix requirements and BS 8500.”
Export the full report as a Word document. Add your engineer’s stamp and project-specific calculations before formal submission.
๐Ÿ“–

Scenario D โ€” Graduate engineer, UPDA exam preparation

UPDA Civil Engineering ยท Structural category
Start a study session: “I am preparing for the UPDA Civil Engineering exam, structural category. Explain the design of simply supported RC beams under combined bending and shear per BS 8110.”
Ask for worked examples: “Walk me through a design example with a 6m span, 20 kN/m UDL, and fcu = 30 MPa.”
Request a summary card: “Summarise the key design checks for RC beams in a compact revision note I can refer to quickly.”
Export the revision note as a PDF to build your study file.

7. Choosing the right plan

ASAS-AI uses a token-based model. Tokens measure AI usage โ€” a short question uses fewer tokens than generating a multi-section report. The table below gives a practical guide to which plan fits different usage levels.

Plan Tokens/month Price Suited for
Free 100,000 $0 Occasional use, exploration, UPDA study
Pro 250,000 $7 / mo Individual engineers with regular document tasks โ€” several per week
Elite 1,000,000 $17 / mo Active practitioners producing multiple documents and reports daily
Elite Plus 2,000,000 $40 / mo High-volume users, teams, or engineers managing multiple concurrent projects
๐Ÿ“Œ
Starting recommendation

Begin on the Free plan to understand your actual usage patterns. Most individual engineers working on one to two active projects will find the Pro plan ($7/month) sufficient for day-to-day document and correspondence tasks.

8. Tips for getting better results

Specificity

Give the platform your project context at the start

State the project name or type, the applicable contract form, relevant codes, your role (contractor / consultant / client), and the task at hand. ASAS-AI uses this context throughout the conversation.

Iteration

Treat the first output as a draft

Ask for revisions within the same conversation: “Make the tone more formal,” “Add a section on programme impact,” or “Shorten the introduction.” The assistant remembers what it produced and refines accordingly.

Attachments

Upload reference documents to anchor the response

You can attach PDFs โ€” specifications, drawings, contracts โ€” and ask ASAS-AI to work with them. For example: upload a specification section and ask “Does this clause comply with QCS 2014 Section 6.3?” or “Summarise the inspection requirements from this document.”

Scope control

Break large documents into sections

For a 20-page report, generate section by section rather than asking for the whole document at once. This produces better-quality output and lets you review and redirect at each stage before continuing.

Code lookup

Use it as a code clause interpreter

Rather than searching through a 600-page specification, ask ASAS-AI directly: “What does QCS 2014 Section 5 say about compaction testing for sub-base?” The platform interprets and explains the requirement in plain language, with the clause reference.

Verification

Verify clause numbers and numeric values independently

ASAS-AI is highly reliable on document structure, tone, and general engineering knowledge. For specific clause references, acceptance criteria, and numeric design values, cross-check against the actual code before submitting work to a client or authority.


Leave a Reply